Search results

Page 4 of results for query 'Asbestos'

Contaminated Land Strategy - 2024 - Dacorum Borough Council

1 Asbestos manufacture, abrasives and related products. ML. HIGH. 50. 2 Chemical works (organic & inorganic). Manufacture of cosmetics, bleaches, manure ...

https://www.dacorum.gov.uk/.../dbc-contaminated-land-strategy.pdf?...1

3. Hicks Road Site Analysis

• some buildings contain asbestos and there contamination arising from the previous industrial activities;. • due to the shortcomings of the existing site ...

https://www.dacorum.gov.uk/.../strategicplanning-11-04-13-hicks-road-ma...

(Public Pack)Minutes Document for Development Management, 28 ...

May 28, 2019 ... i) Construction or Demolition Hours of Operation j) Dust and Noise control measure k) Asbestos survey and control measure where applicable.

https://democracy.dacorum.gov.uk/documents/.../DMC-28-05-19-Minutes....

APPENDIX D SITE PHOTOGRAPHS - Dacorum Borough Council

Asbestos. Chemical Contamination. Empty Used Containers. Liable To Cause A ... Excav'N Spoil. Other Similar Inert Waste. Sub/Topsoil. Asbestos. Chemical ...

https://www.dacorum.gov.uk/.../js18-geoenvironmental-desk-top-study-20...

HOUSING STRATEGY 2008-2011 - Dacorum Borough Council

repairs. ▫ Asbestos management system commissioned. ▫ Refurbishment of Lagley House elderly persons scheme. ▫ Commencement of Fire Risk Assessment works and ...

https://www.dacorum.gov.uk/.../spar-12.08.01-housing-strategy-2008---20...

Hicks RoadMasterplan Updated Oct 2011 - Dacorum Borough Council

• some buildings contain asbestos and there contamination arising from the previous industrial activities;. • due to the shortcomings of the existing site ...

https://www.dacorum.gov.uk/.../spar-11.11.10-hicksroad-masterplan-lowre...

Hertfordshire Waste Development Framework

demolition, trade and asbestos) collected by the county council14. 2.36 The most up to date data from Defra15 provided regional estimates for. Commercial and ...

https://www.dacorum.gov.uk/.../waste-core-strategy-dev-man-policies-2012...

Our Growth and Infrastructure Strategy to 2050

Legionella, asbestos management and proactive electrical testing. Solving private sector housing problems. The housing service has recently launched a new ...

https://www.dacorum.gov.uk/.../dacorum-growth-and-infratstructure-strate...

Combined Phase I & II Geo-Environmental Assessment Fields End ...

The. Report does not constitute an archaeological or ecological assessment, nor does it constitute an asbestos inspection or flood assessment. Page 9. Phase I ...

https://www.dacorum.gov.uk/docs/default.../js8-ground-conditions2.pdf?...

Berkhamsted Conservation Area - Dacorum Borough Council

The asbestos-roofed classroom attached at west end and the later lean-to on Mill Street is not included in the local listing. Gymnasium, Berkhamsted School ...

https://www.dacorum.gov.uk/.../berkhamstedconservationareaappendices.p...