Search results

Page 4 of results for query 'Flooding'

NMB PLANNING

... flood levels associated with flooding from the canal. The extent of the various Flood Zones are therefore based on broad scale flood mapping, which are ...

https://www.dacorum.gov.uk/.../matter-6-written-statement---nmb-planning...

Strategic Flood Risk Assessment - Tile C3 - Dacorum Borough ...

Flood Defence Structure. Maintained Channel. Non-Flood Defence Structure. Raised Defence (man-made). Raised Defence (natural). STRUCTURES & DEFENCES DACORUM ...

https://www.dacorum.gov.uk/.../tile-c3_dacorum-borough-council---strucu...

DEVELOPMENT CONTROL COMMITTEE Thursday 8th September ...

Sep 8, 2016 ... frequency of flooding. Using these measures a cost benefit analysis is undertaken to determine prioritisation of sewer flooding properties.

https://democracy.dacorum.gov.uk/.../s6265/DCC-08-09-16-Addendum.pd...

Non-Domestic Rate Relief Guidance Manual

• Were flooded between 1 December 2013 and 31 March 2014 as a result of adverse weather conditions. • The flooding at the property has adversely affected ...

https://democracy.dacorum.gov.uk/CeConvert2PDF.aspx?...

4/01116/19/ROC VARIATION OF CONDITIONS 12 (FLOOD RISK ...

Jul 25, 2019 ... 4/01116/19/ROC. VARIATION OF CONDITIONS 12 (FLOOD RISK. ASSESSMENT),19 (CONSTRUCTION PHASE MITIGATION. MEASURES), 20 (NOISE MITIGATION) AND ...

https://democracy.dacorum.gov.uk/.../DMC-25-07-2019-Item%205c-Mayl...

South South West Herts Level 1 Strategic Flood Risk Assessment ...

Strategic Flood Risk Assessment: site screening. % within. Historic. Flood Map. % within Risk of. Flooding from. Reservoirs. Presence of watercourse. (Detailed ...

https://www.dacorum.gov.uk/.../south-west-herts-level-1-strategic-flood-ris...

Land West of Hemel Hempstead

40.0 2153.5 Flood Risk. 360 min Winter 0.992 0.992. 40.0 2136.8 Flood Risk. 480 min Winter 0.962 0.962. 40.0 2073.8 Flood Risk. 600 min Winter 0.925 0.925. 40.0 ...

http://www.dacorum.gov.uk/.../js3-flooding-and-drainage-appendixc-d.pdf...

Dacorum Borough Local Plan 1991 - 2011 SUPPLEMENTARY ...

flooding - because rain is piped to watercourses all water arrives in streams and rivers at the same time before it has a chance to soak into the ground ...

http://www.dacorum.gov.uk/.../supplementary-planning-document-on-wate...

Agenda item - 4/02214/17/ROC - VARIATION OF CONDITIONS 12 ...

4/02214/17/ROC - VARIATION OF CONDITIONS 12 (FLOOD RISK ASSESSMENT), 19 (CONSTRUCTION PHASE MITIGATION MEASURES), 20 (NOISE MITIGATION) AND 26 (APPROVED ...

https://democracy.dacorum.gov.uk/mgAi.aspx?ID=7194

Untitled

Flood Relaf Culvert. Markyate Flood Storage Area. Embankment. River Ver. River Lee (Upper). Dacorum Borough Council. River Gade. St. Albans District Council.

http://www.dacorum.gov.uk/.../tile-g---major-defences-and-flood-alleviatio...